Description
【Product Introduction】
E337 epoxy colored intermediate paint is a two-component solvent-based low-odor epoxy resin intermediate coating material. Because it contains filler materials, this product can be tinted according to the color of the topcoat. It has low cost, can be cured at low temperature, and has great Good adhesion, high strength, strong and durable, suitable for base leveling treatment.
【Application Scope】
Leveling applications in industrial plants, warehouses, underground parking lots, and office spaces
【Material Advantages】
● This paint can be adjusted according to the color of the topcoat, which can reduce the disadvantages of blooming of the topcoat.
●Easy to use, add sand or powder and then apply by scraping, and the workability is good.
●Easy to scrape and polish, and the effect is obvious after scraping.
● Lower odor compared to other solvent-based products.
【Product Information】
The material is divided into two components: A and B.
Component A solid color viscous liquid 20kg/barrel
Ratio: A component: B component = 4:1
Packaging: Printed metal packaging drum. It is recommended to stack it in three layers when stacking.
Storage: The storage temperature is 5-35℃. It should be stored in a cool, ventilated and dry warehouse, away from fire and heat sources. It is strictly prohibited to expose it to the sun.
【Technical Data】
Drying time: 2-24 hours (23℃, relative humidity 50%)
Sandability: Easier to sand, non-stick sandpaper
Bonding strength: >2.5Mpa
Compressive strength: >50Mpa
【System information: 1mm thick and thin coating epoxy floor system】
Bottom layer: 1-2 coats of E159X epoxy primer can be used
Intermediate leveling layer: Use E337 epoxy colored intermediate paint plus sand, scrape 1-2 coats
Surface layer: Apply E860 epoxy topcoat once, or E556 epoxy topcoat twice.
【System Recommended Dosage】
Floor System
|
Material Name
|
Usage
|
Remarks
|
1mm thin coating type Epoxy floor paint | E159X epoxy primer | 0.15-0.2kg/㎡ per pass | depending on ground conditions |
E337 epoxy intermediate paint | 0.4kg/㎡/mm thick | sand scraping | |
E860 epoxy topcoat | 0.06-0.08kg/㎡ | Scratch it once | |
E860 epoxy topcoat | 0.25-0.3kg/㎡ | Roll on twice | |
1mm thin coating type Epoxy floor paint | E159X epoxy primer | 0.15-0.2kg/㎡ | depending on ground conditions |
E337 epoxy intermediate paint | 0.25-0.3kg/㎡/mm thick | sand scraping | |
E556 epoxy topcoat | 0.06-0.08kg/㎡ | Scratch it once | |
E556 epoxy topcoat | 0.22-0.27kd/㎡ | Roll on twice |
【Grassroots requirements】
The grade of the concrete floor should be greater than C25, the tensile strength should be ≥1.5Mpa, and the flatness should be ±4mm/2m ruler, the base surface must be dry, clean, free of oil and other contaminants
【Basic Treatment】
Use a floor grinder to grind the entire ground to be constructed to remove floating dust and protruding concrete residues on the surface of the base layer.
【Construction Conditions】
Ground base temperature: 5-35℃
Ground base moisture content: <8%
Construction epoxy temperature: 5-35℃
Relative humidity of construction environment: <80%
【Construction methods/tools】
This paint is generally applied by scraping; tools used: trowel
【Available time】
The ambient temperature is 10℃ and it can be used for 90 minutes.
Suitable for 60 minutes when the ambient temperature is 20℃
The ambient temperature is 30℃ and it can be used for 30 minutes.
【Construction interval】
Construction environment temperature 5-15℃ and the construction interval is 48 hours
The construction environment temperature is 15-20℃ and the construction interval is 36 hours.
The construction environment temperature is 20-30℃ and the construction interval is 24 hours.
【Safeguard】
Materials should be stacked in a centralized and orderly manner, with police lines and warning signs around them. Open fires are strictly prohibited on site.
During construction, workers should wear labor protection equipment to ensure the safety of themselves and others.
When the construction site is closed, ventilation should be done well
【Precautions】
This product is a colored leveling product, the color is similar to the topcoat, but not exactly the same.
This product needs to be dried for 12-24 hours after construction before proceeding to the next construction step.
Note that epoxy products are two-component curing materials. When preparing coatings, read the labels clearly and do not mix them up.
Do not violate the mixing ratio and use it up as soon as possible and within the applicable time limit.
This paint will have a small amount of precipitation after being stored for a period of time. This is not a quality problem. It can be used normally after stirring evenly.
Because this paint contains solvents, it is not recommended for use as a repair material.
【Recommended Mortar Ratio】
A+B | 40-80 grit | 80-120 grit | 325 grit | |
Coarse Mortar | 20+5 | 16KG | 8KG | |
Fine Mortar | 20+5 | 20KG | ||
Putty | 20+5 | 10KG |
【first-aid】
Skin Contact: Wash with plenty of water and remove contaminated clothing and shoes.
Eye contact: Rinse with running water or saline and seek medical attention if necessary.
Inhalation: Move to fresh air and keep respiratory tract open. If you feel unwell, please seek medical attention.
Ingestion: Clean mouth, induce vomiting, seek medical attention.
【Fire-fighting measures】
Hazardous characteristics: Can burn when exposed to open flames. Hazardous combustion products: CO, CO2, etc.
Fire extinguishing methods and fire extinguishing media: dry powder, carbon dioxide, sand. Evacuate nearby and surrounding personnel. Fire extinguishers should wear pressure oxygen breathing apparatus and spray containers exposed to the fire with water.
Cooling, dispersion and evaporation