Description
Main Feature
● Simple, convenient and fast construction
● Wear-resistant, durable, economical and environmentally friendly
● Excellent product fluidity
● Short construction period
Detailed introduction
E2315 cement self-leveling mortar is composed of special cement, selected aggregates and various additives. When mixed with water, it forms a self-leveling foundation material with strong fluidity and high strength. This material cannot be tinted.
Application scope
Suitable for precise leveling of concrete floors and all flooring materials, construction of new floors and renovation of old floors; widely used in industrial plants, parking lots, residential and office spaces
Product Information
The material is dry mixed powder material
Packaging: Moisture-proof paper bag packaging. It is recommended to stack 6-8 layers when stacking.
Packaging specifications: 25kg/bag
Storage: The storage temperature is 5-35℃. It should be stored in a cool, ventilated and dry warehouse, away from humid environments and heat sources.
Technical data
24h compressive strength: ≥6.0 Mpa
24h flexural strength: ≥2.0 Mpa
28d compressive strength: ≥C30
28d flexural strength: ≥F7
Fluidity: ≥130 mm
Combustion performance: Class A
System Message:
6mm cement self-leveling system:
Bottom layer: 1-2 layers of cement self-leveling interface agent can be used
Surface layer: 1 layer of cement self-leveling
Protective agent: Use 2-3 layers of cement spontaneous abortion protective agent
N430 polyurethane cover can also be used for one coat of scraping.
System recommended dosage
Floor system: 5-6mm cement self-leveling system
Material Name Dosage Remarks
Interface agent 0.2-0.25kg/㎡ depending on ground conditions
Cement self-leveling 8.5-10kg/㎡
Cement self-leveling protective agent 0.15kg/㎡
N430 polyurethane topcoat 0.08-0.1kg/㎡
Grassroots requirements
The grade of the concrete floor should be greater than C25, the tensile strength should be ≥1.5Mpa, and the flatness should be ±4mm/2m based on ruler. The base surface must be dry, clean, and free of oil and other pollutants.
Basic treatment
Use a sandblasting machine or floor grinder to sandblast and polish the entire ground to be constructed to remove floating dust on the base surface.
Construction Conditions
Ground base temperature: 8-35℃
Construction environment temperature: 8-35℃
Ground base moisture content: <8%
Relative humidity of construction environment: <80%
Construction methods/tools
The construction of cement self-leveling is generally carried out by scraping. Tools used: toothed scraper. Protective agent: general wax mopping.
Available time
Ambient temperature Walking time Driving time
10-15℃ 2 days 7 days
15-20℃ 2 days 7 days
20-30℃ 1 day 7 days
Safeguard
Skin Contact: Wash with plenty of water and remove contaminated clothing and shoes. Eye contact: Rinse with running water or saline and seek medical attention if necessary. Inhalation: Move to fresh air and keep respiratory tract open. If you feel unwell, please seek medical attention. Ingestion: Clean mouth, induce vomiting, seek medical attention.
Precautions
After the base layer is polished, pay attention to whether there are any cracks on the ground. If there are any cracks, they should be dealt with first before proceeding with the next step. The cement surface must be flat, and the height difference within two meters must be less than 4mm.
First-aid
Skin Contact: Wash with plenty of water and remove contaminated clothing and shoes.
Eye contact: Rinse with running water or saline and seek medical attention if necessary.
Inhalation: Move to fresh air and keep respiratory tract open. If you feel unwell, please seek medical attention.
Ingestion: Clean mouth, induce vomiting, seek medical attention.