【Product Introduction】

E811-2 solvent-free primer-in-one paint is a solvent-free epoxy resin varnish, which is composed of liquid epoxy resin, low viscosity solid chemical composition. It can be used as a primer, or quartz sand of appropriate particle size can be added as an intermediate paint according to needs.

 

【Feature Description】

●Good penetration and adhesion to porous substrates such as concrete

●Strong adhesion, forming a physical anchoring state with the cement base after curing

●High solid content, low VOC emissions and low odor

●Not suitable for surfaces where the surface is very smooth and dense, and the pores cannot be opened by polishing to achieve penetration.

 

【Technical indicators】

Condition: uniform, no lumps, no impurities
Bonding strength: ≥2.5MPa
Drying time:(Temperature is 25℃, relative humidity is 50%)
Tack dry: less than 4 hours
Hard work: less than 24 hours

 

【product Information】

The material is divided into two components: A and B
Component A: Transparent liquid 20kg/barrel
Component B: brown red liquid 10kg/barrel
Ratio: A:B=2:1
Packaging: Printed metal packaging drum. It is recommended to stack it in three layers when stacking.
Storage: The storage temperature is 5-35℃. It should be stored in a cool, ventilated and dry warehouse, away from fire and heat sources. It is strictly prohibited to expose it to the sun.

 

【Grassroots Requirements】

The compressive strength of the concrete floor is ≥20Mpa, and the tensile strength should be ≥1.5Mpa, flatness ±4mm/2m. By ruler, the base surface must be dry, clean, and free of oil and other pollution.

 

【Instructions for use】

Surface treatment: Before construction, dust, sand, cement laitance, grease, old coatings, etc. should be removed from the base surface, and polished to form a rough surface to open the capillary pores on the base surface.

Theoretical dosage: about 0.15 kg/square meter
Ratio: A:B=2:1 (weight ratio), mix evenly before construction.

Opening time: Materials A and B should be used within 20 minutes after mixing. If the viscosity of the material is found to be significantly increased, it cannot be used anymore and should be discarded.

 

【Construction Conditions】

※Ground base temperature: 5-35℃
※Construction environment temperature: 5-35℃
※Moisture content of ground base: <8%
※Relative humidity of construction environment: <80%

 

【Construction methods and tools】

Dilution: 0-30%
Construction method: Roller coating, scraping coating, spraying can be used. Pay attention to even application without accumulation or leakage.
Tools: push knife, roller brush

 

【Tool Cleaning】

Clean tools with thinner immediately after use.

 

【First-aid】

Skin Contact: Wash with plenty of water and remove contaminated clothing and shoes.
Eye contact: Rinse with running water or saline and seek medical attention if necessary.
Inhalation: Move to fresh air and keep respiratory tract open. If you feel unwell, please seek medical attention.
Ingestion: Clean mouth, induce vomiting, seek medical attention.

 

【Precautions】

● For safe use of the product, please ask the manufacturer for product safety data.

● Construction workers should strengthen safety protection when using this product, and the construction environment should be kept ventilated.

● This product is a flammable item. It should be kept away from fire sources and flammable and explosive items during transportation, storage and construction.

● For any questions, please contact local distributors or directly contact the factory.

Get in touch

Your inquiry will be highly valued and answered within 12 hours.

about-us