Description
【Product Introduction】
E860 spreading epoxy topcoat is a thin-coat epoxy topcoat. It is formulated with high-quality epoxy resin and curing agent. It has high gloss,
It has good leveling properties, full paint film, and bright colors. It is mainly suitable for industrial buildings such as factories, warehouses, parking lots, hospitals, canteens, etc.
For protection and decoration of floors in residential buildings and other places, it can be applied by spraying or roller coating.
【Feature Description】
●Full paint film, bright and rich colors
●Smooth and bright, beautiful and seamless
●Excellent leveling performance, no roller marks.
【Technical indicators】
Status: Even after stirring, no lumps, no impurities
Bonding strength : ≥2.5MPa Compressive strength ≥70MPa Hardness >2H
Wear resistance: <0.05
Drying time: (Temperature is 25℃, relative humidity is 50%)
【Product Information】
The material is divided into two components: A and B
Component A: solid color viscous liquid 20kg/barrel
Component B: yellowish transparent liquid 5kg/barrel
Packaging: Printed metal packaging drum. It is recommended to stack it in three layers when stacking.
Storage: Storage temperature 5-35℃, should be stored in a cool, ventilated and dry warehouse.
Keep away from fire and heat sources, and strictly prohibited from exposure to sunlight
【Grassroots Requirements】
The compressive strength of the concrete floor should be ≥20Mpa, and the tensile strength should be ≥1.5Mpa.
The wholeness is ±4mm/2m. The base surface must be dry, clean and free of oil and other pollution.
【Construction Conditions】
※Ground base temperature: 5-35℃
※Construction environment temperature: 5-35℃
※Moisture content of ground base: <8%
※Relative humidity of construction environment: <80%
【Construction methods and tools】
Dilution: 0-5%, depending on the actual conditions at the construction site
Construction method: brushing, rolling or spraying.
Tools: roller brush
【Instructions for use】
Surface treatment: Before construction, dust, sand, grease, and old coatings should be removed from the base surface, putty should be used to smooth cracks and holes, primer should be used to seal the base surface, and epoxy intermediate paint should be scraped and leveled.
Theoretical dosage: about 0.25-0.35 kg/square meter, there will be some difference between different colors
Certain differences.
Ratio and opening time: The ratio of main agent to curing agent is 4:1 (weight ratio).
It must be mixed strictly according to the proportion and stirred evenly before use. After mixing materials A and B, they should be
Use within 45 minutes. If the viscosity of the material is found to increase significantly, it cannot be used further.
For disposal.
【Construction Tips】
◈ The construction environment must be clean, clean and dust-free to avoid affecting the coating effect.
◈ The paint should be stirred evenly after opening the can to avoid color difference.
◈ Construction should be stopped when the temperature is lower than 5℃
◈ Construction is not suitable in humid weather. The ideal humidity for construction is 35%-80% (relative to humidity).
【First-aid】
Skin Contact: Wash with plenty of water and remove contaminated clothing and shoes. eye contact
Contact: Wash with running water or saline and seek medical attention if necessary.
Inhalation: Move to fresh air and keep respiratory tract open. If you feel unwell, please Seek medical attention.
Ingestion: Clean mouth, induce vomiting, seek medical attention.
【Precautions】
● For safe use of the product, please ask the manufacturer for product safety data
Materials (MSDS).
● Construction workers should strengthen safety protection when using this product, and the construction environment should be protected.
Keep ventilated.
● This product is flammable and should be kept away from fire sources and objects during transportation, storage and construction.
Flammable and explosive items.
● For any questions, please contact local distributors or directly contact the factory.