JY-2006 Inorganic Engineering Interior Wall Paint

This product is a water-based one-component inorganic coating composed of inorganic film formers, inorganic pigments and additives. It can meet Class A fire protection requirements and is the first choice interior wall coating for large apartments and underground parking lots.

Description

Main Feature

*Class A fire resistance rating, meeting the fire protection rating requirements for large public buildings

*Inorganic emulsion, inorganic pigment, professional formula

*High cost performance and excellent environmental protection indicators

 

Scope of application

It can be widely used in large apartments, underground parking lots, etc.

 

Technical Parameters

Implementation standards: GB/T9756-2018, GB18582-2020, GB50222-2017, GB8624-2012

Theoretical paint consumption: 3~4 square meters/kg/two coats (calculated based on dry film thickness of 30 microns)

Drying time: 1 hour to surface dry (at an ambient temperature of 23°C and a relative humidity of 50%)

Dry for 2 hours (at an ambient temperature of 23°C and a relative humidity of 50%)

Recoating time: 4 hours (at an ambient temperature of 23°C and a relative humidity of 50%

Contrast ratio: ≥0.90

Scrub resistance: ≥1500 times

Shelf life: 24 months from the date of production (unopened)

Applicable reference

Please read the instructions for use before construction

Substrate: It should be solid, clean, dry (moisture content ≤ 10%), PH ≤ 10; for powdered substrates, use tools such as a shovel or wire brush to remove the powdered layer and completely remove the mildew.

Old paint film: Check the aging of the old paint film, and loose parts should be completely removed

Salting out: It is recommended to treat it with an oxalic acid solution of appropriate concentration (the specific concentration should be determined according to the degree of salting out, but the concentration generally does not exceed 5%), then rinse it with clean high-pressure water and dry it

Construction method: roll coating or spraying

Dilution: Do not add water. Utensil cleaning: Wash with clean water in time after construction is completed.

Safety and labor protection: Safety measures should be taken during construction and labor protection clothing should be worn.

 

Environmental requirements

*Stored in a dry and ventilated warehouse at 5~35℃

*Construction environment: temperature ≥5℃ (base temperature ≥10℃), humidity ≤85%

*Transportation: handled as non-dangerous goods, protected against freezing and exposure to sunlight

Get in touch

Your inquiry will be highly valued and answered within 12 hours.

about-us