Description
Product Introduction:
This product is a thick decorative coating composed of finely ground fillers, pure acrylic adhesive and other additives.
Main Feature:
*Rich texture, long-lasting color retention and bright colors
*Rich expression and strong three-dimensional sense
*Excellent adhesion and elasticity
*Waterproof and breathable
*Excellent weather resistance
*Water-based products, safe and environmentally friendly
Scope of application:
It is suitable for wall decoration on various base materials such as industrial and commercial buildings, office buildings, factories, hospitals, apartment buildings, etc.
Technical Parameters:
Implementation standard: JG/T24–2000
Theoretical paint consumption: 2.5-3.0 kg/square meter
Drying time: 3-4 hours to surface dry (at ambient temperature of 23°C and relative humidity of 50%)
Shelf life: 6 months from the date of production (unopened)
Use reference:
Please read the instructions for use before construction
*Substrate: should be solid, clean, dry (moisture content ≤10%), PH<10; for powdered substrates, use tools such as a spatula or wire brush to remove the powdered layer and completely remove mold spots.
*Make sure all dust and foreign matter are brushed or scraped away. It is also necessary to ensure that the wall is free of salt, alkali, grease and ridges. During construction, all adjacent walls must be covered to avoid being sprayed. All cracks and peeling areas should be filled and leveled with Jinding flexible putty. Before formal application, it is recommended to use Jinding penetrating primer.
*When applying this product to old walls, make sure the wall base is solid. When applying the first coat, rinse the wall with clean water, scrub it clean, and then apply this product after it dries.
*Construction method: spraying, scraping or wiping (depending on the decorative effect)
*Dilution: Generally, there is no need to add water to dilute it. If the material is thick, you can add no more than 5% water to dilute it.
*Utensil cleaning: Wash with clean water in time after construction is completed
*Safety and labor protection: Safety measures should be taken during construction and labor protection clothing should be worn.
*Supporting system: JD4004 universal sealing primer
Environmental requirements:
*Stored in a dry and ventilated warehouse at 5~35℃
*Construction environment: temperature 5-40℃, humidity ≤85%, wind speed during spraying should be less than 6 meters/second, and air compressor supply pressure should be above 6 kg.
*Transportation: handled as non-dangerous goods, protected against freezing and exposure to sunlight